You can get a government EV charger grant in 2026 if you rent, own a flat, have only on-street parking, are a landlord, or are a business, charity, public body or school. Owner-occupiers of a house with a driveway cannot, unless the house is also their registered place of business. Five OZEV schemes are open until 31 March 2027, paying 75% of the cost up to £500 per socket (£2,000 for state-funded schools), and you must have approval before the charger is fitted.
The five grants open now
OZEV extended its home and workplace chargepoint grants for a final year from 1 April 2026. Five schemes are open until 31 March 2027, and the maximum for residents, landlords and workplaces rose from £350 to £500 per socket. Three other schemes, the staff and fleets grant, the commercial landlord grant and the residential landlord infrastructure grant, closed to applications on 31 March 2026.
| Scheme | Who it is for | Grant | Limit |
|---|---|---|---|
| Renters and flat owners | You rent, or own a flat, with private off-street parking | 75% up to £500 | One socket |
| On-street parking | No off-street parking; permanent cross-pavement kit | 75% up to £500 | One socket |
| Landlords | Landlords, social housing, managing agents | 75% up to £500 per socket | 200 sockets |
| Workplace Charging Scheme | Businesses, charities, public sector, small accommodation businesses | 75% up to £500 per socket | 40 sockets |
| Workplace scheme for state-funded education | State-funded schools, colleges and other institutions | 75% up to £2,000 per socket | 40 sockets |
Can a homeowner with a driveway get a grant?
No, in most cases. The renters and flat owners grant excludes anyone who lives in a house they own, unless the house has been converted into flats and they live in one of them. The on-street grant is only for homes without private off-street parking. Landlords cannot claim for a property they live in.
The exception is a home that is also your primary place of work. If the address is registered with Companies House as your place of business or is on a business rates bill, the Workplace Charging Scheme can apply to a charger on your drive, with extra conditions on the charger model. Our guide to the Workplace Charging Scheme at home covers that route. If you are both a homeowner and a small landlord, treat each property separately: a grant that works at a let flat does not apply to your own house.
What the grant pays in practice
Every scheme pays 75% of the cost of buying and installing the charger, up to the cap. For the £500 schemes the cap is reached once the eligible cost passes about £667 per socket; above that, the grant is £500 a socket whatever the cost. For state-funded schools the cap is reached at about £2,667 per socket.
Price the install first, then subtract the grant only once you are approved. Extra work such as a consumer unit, a long trench, a post, highways fees or making good can push the bill well past the cap, so ask the installer to show what you pay if the claim is refused or delayed. OZEV's terms say the invoice must show the price that would have been charged without the grant.
The order of events matters
Since 1 April 2026 residents and landlords apply themselves through the Find a Grant service. OZEV checks eligibility and the charger must not be installed until OZEV has confirmed. The installer then claims the grant through a link OZEV sends. Workplace applicants get a voucher code by email, valid for 180 days, and give it to the installer.
Every scheme needs an OZEV-authorised installer and a charger from the authorised model list. A charger fitted before approval, or one already paid for by another grant, cannot be funded.
- Check the scheme for your tenure and parking
- Apply and wait for OZEV approval or a voucher
- Book an OZEV-authorised installer and an eligible model
- The installer claims after fitting
Scotland, Wales and Northern Ireland
These are UK schemes. The renters and flat owners grant and the landlord grant cover properties anywhere in the UK, and the on-street, workplace and education schemes name England, Wales, Scotland and Northern Ireland. The Channel Islands and the Isle of Man are excluded. Scotland also has its own grants on top, including up to £400 for homes in rural postcodes; our guide to grants in Scotland, Wales and Northern Ireland sets out what each nation adds.
What happens after March 2027
GOV.UK describes this as the final year of these grants. The government says it will aim to give at least four weeks' notice of the last dates for applications and claims, and reserves the right to change the schemes at any time. If you qualify and are planning a charger anyway, apply well before the March 2027 deadline so the voucher or approval and the install both fit inside it.
Frequently asked questions
Is there a government grant for EV chargers in 2026?
Yes, for renters, flat owners, homes with only on-street parking, landlords, businesses and schools. Five OZEV schemes are open until 31 March 2027.
How much is the EV charger grant?
75% of the cost up to £500 per socket for residents, landlords and workplaces, and up to £2,000 per socket for state-funded schools and colleges.
Can I get a grant for a charger on my own driveway?
Not if you own and live in a house with a driveway, unless the house is your registered place of business and you use the Workplace Charging Scheme.
Is the old EVHS £350 grant still available?
No. The Electric Vehicle Homecharge Scheme is not among the open schemes listed on GOV.UK. The current schemes pay up to £500 per socket from 1 April 2026.
Can I fit the charger first and claim later?
No. Residents and landlords must wait for OZEV's confirmation, and workplaces need a voucher, before the charger is installed.
Core buying guides
Start with these high-intent guides, then dig into the rest of the library.
Related guides
- How to claim the OZEV grant for flats and renters
- Workplace Charging Scheme at home: can a home business claim for a driveway charger?
- EV charger grants in Scotland, Wales and Northern Ireland: what is different in 2026
- Workplace Charging Scheme 2026: the business EV chargepoint grant explained
- Landlord EV charger grant UK: residential and commercial routes
Sources and further reading
- GOV.UK: Electric vehicle chargepoint grants
- GOV.UK: Changes to chargepoint grant schemes from 1 April 2026
- GOV.UK: Chargepoint grant for renters or flat owners, eligibility
- GOV.UK: Chargepoint grant for landlords, eligibility
- Find a grant: chargepoint grant for households with on-street parking
- GOV.UK: Workplace Charging Scheme for state-funded education institutions
- GOV.UK: OZEV home and workplace grants terms and conditions
How this guide was prepared
This guide was written by the Local EV Installers Editorial Team. We compare official guidance, legislation and established consumer information, separate general information from project-specific advice, and show publication dates and sources. We do not accept installer accreditation claims at face value.
