Workplace Charging Scheme 2026: the business EV chargepoint grant explained

Which UK businesses, charities, public bodies and schools can use the Workplace Charging Scheme until March 2027, the £500 per socket cap, the 40 socket limit, sites that are excluded and what replaced the closed staff and fleets grant.

By Local EV Installers Editorial Team · Published · Updated

The Workplace Charging Scheme is the business EV chargepoint grant still open in 2026. It pays 75% of the cost of buying and installing chargers, including VAT, up to £500 per socket and 40 sockets per applicant, for businesses, charities, public sector bodies and small accommodation businesses anywhere in the UK. State-funded schools get up to £2,000 per socket. It closes on 31 March 2027. The staff and fleets grant and the commercial landlord grant closed on 31 March 2026.

Which business grant is still open

Until March 2026 a business could choose between several OZEV schemes. Three of them closed to applications on 31 March 2026: the staff and fleets grant for businesses with fewer than 250 staff, the commercial landlord grant, and the residential landlord infrastructure grant. Installers had until 26 May 2026 to claim for work already approved.

From 1 April 2026 the Workplace Charging Scheme is the main route for business premises, with the cap raised from £350 to £500 per socket. The table compares it with the scheme it effectively replaced.

FeatureWorkplace Charging SchemeStaff and fleets grant (closed)
StatusOpen until 31 March 2027Closed 31 March 2026
Who could applyBusinesses, charities, public bodies, small accommodationBusinesses with fewer than 250 staff
Grant75% up to £500 per socket75% up to £15,000 per installation
What it paid forPurchase, installation and infrastructure£350 per socket and £500 per parking space of wiring
Socket rulesUp to 40 sockets across all sitesMinimum 1 socket and 5 spaces

Who can apply and what evidence you need

Applicants must be a business, charity, public sector organisation or small accommodation business. DVLA, which runs the scheme, asks for one of a Companies House reference number, a VAT registration number or a business rates bill. Charities can upload their Charity Commission registration or a letter from their principal regulator. Without accepted evidence, no voucher is issued.

The parking must be designated to you and used by staff or fleet vehicles. The scheme does not fund parking used only by customers, parking that is not yet built, or chargers that planning or Building Regulations already require, such as Part S in England for buildings under construction or being renovated.

  • Off-street parking designated to your organisation
  • Staff or fleet use, not customer-only bays
  • Not a site already funded by OZEV or another grant
  • Not a charger that is a planning or Part S requirement

Schools and colleges

State-funded schools, colleges and other state-funded education institutions have their own version of the scheme, paying 75% up to £2,000 per socket for up to 40 sockets, in England, Wales, Scotland and Northern Ireland. Vouchers for applications submitted before 1 April 2026 stay valid at up to £2,500 per socket. Independent schools apply through the main Workplace Charging Scheme instead.

Homes used as a workplace

A home can count as a workplace if it is your primary place of work and the address is registered with Companies House or on a business rates bill. Employers can also fit chargers at employees' homes for company vehicles, with a DVLA evidence letter. In both cases the charger must be listed for residential and commercial use. Our separate guide covers home businesses and staff homes in detail.

Worked example: a 6 socket staff car park

Take three twin-socket chargers, six sockets in all, with a hypothetical installed cost of £9,000 including VAT. 75% of that is £6,750, but the cap is 6 sockets at £500, so the grant is £3,000 and the business pays £6,000. Whenever the cost passes about £667 per socket, the cap, not the percentage, decides the grant.

That is why the grant matters less than the design. Load management, cable routes and any supply upgrade usually decide whether a project is affordable. Get the survey and the network operator's view before you size the order, and model the full cost without the grant first. Where a landlord and tenant share the car park, put the alteration licence and who pays for the electricity in writing before applying.

LineAmount
Hypothetical installed cost, 6 sockets, including VAT£9,000
75% of cost£6,750
Cap: 6 sockets × £500£3,000
Grant paid (the lower figure)£3,000
Business pays£6,000

How to apply

Applications go through the GOV.UK workplace chargepoint service, run by DVLA. The voucher it issues is valid for 180 days and is passed to an OZEV-authorised installer, who fits chargers from the authorised model list and claims the grant. Installing before the voucher arrives forfeits the grant.

Grants count toward the minimal financial assistance limit of £315,000 over three financial years, together with other public subsidies, so groups with other funding should check their total. Ask your accountant how the grant interacts with capital allowances. The scheme closes at 11:59pm on 31 March 2027.

Frequently asked questions

Is the Workplace Charging Scheme still open?

Yes. It is open until 11:59pm on 31 March 2027, paying up to £500 per socket for installs completed from 1 April 2026.

What happened to the staff and fleets grant?

It closed to new applications on 31 March 2026, with installer claims due by 26 May 2026. Most businesses now use the Workplace Charging Scheme.

How many sockets can a business claim for?

Up to 40 sockets across all of its sites, in total.

Can charities and councils apply?

Yes. Charities and public sector organisations are eligible alongside businesses and small accommodation businesses.

Will the grant pay for a supply upgrade?

The grant covers 75% of the purchase, installation and infrastructure costs of the chargepoints, capped at £500 per socket. On a large supply upgrade the cap is likely to be the limit, so budget that work without assuming the grant.

Core buying guides

Start with these high-intent guides, then dig into the rest of the library.

Related guides

Sources and further reading

How this guide was prepared

This guide was written by the Local EV Installers Editorial Team. We compare official guidance, legislation and established consumer information, separate general information from project-specific advice, and show publication dates and sources. We do not accept installer accreditation claims at face value.

Read our full editorial policy.

Get a quote

Get EV charger installation quotes

Start with the installation postcode and service. Add optional detail only if you have it.

Free, no obligationSubmit the form at no cost. You decide whether to accept any quote.

Local introductionsWe pass your enquiry to installers covering the postcode. Reply speed and volume both vary.

No lead sellingDetails go only to relevant installers for quote contact. See the privacy notice.

Ask each company for OZEV status where relevant, competent-person membership and insurance. We introduce local installers.

Add more project detail (optional)

You choose whether to accept any quote. Read our installer checks and privacy notice.

Get free quotes