No driveway? Get your council request and grant paperwork written for you, £19.See the pack

Vehicles

MINI home charging guide: Cooper Electric, Aceman and Countryman Electric

Charging a MINI Cooper E or SE, Aceman or Countryman Electric at home in the UK, with charge times and tips for small drives and terraced streets.

By Local EV Installers Editorial Team · Published · Updated

Current MINI electric models accept 11kW AC, so a 7kW wallbox charges any of them overnight with time to spare. The Cooper E and Aceman have relatively small batteries, which means most owners only need a few hours on the charger each week. Short drives and terraced frontages are common for MINI owners, so cable length and charger position matter more than charging speed.

MINI home charging times by model

Of the MINI models below, the Cooper E refills fastest at home, about 5.5 hours from empty, while the Countryman Electric needs about 9.5 hours. Daily top-ups take far less.

Approximate UK figures; check your handbook for your version.
ModelTypeBatteryMax AC charging0 to 100% on 7kW
Cooper EElectricabout 36.6 kWh11kWabout 5.5 hours
Cooper SEElectricabout 49.2 kWh11kWabout 7.5 hours
AcemanElectricabout 38.5 or 49.2 kWh11kWabout 7.5 hours
Countryman ElectricElectricabout 64.6 kWh11kWabout 9.5 hours

Fitting a charger on a small frontage

If you park on a short front drive, mount the charger close to where the car's port ends up and keep the cable off the pavement. Trailing a cable across a footway is not allowed, so owners without off-street parking need a council-approved solution or public charging instead.

Compact chargers such as untethered sockets suit small walls and avoid a coiled cable hanging by the front door.

Frequently asked questions

How long does a MINI Cooper SE take to charge at home?

About seven to eight hours from empty on a 7kW wallbox, and much less for a typical top-up.

Core buying guides

Start with these high-intent guides, then dig into the rest of the library.

Related guides

Sources and further reading

How this guide was prepared

This guide was written by the Local EV Installers Editorial Team. We compare official guidance, legislation and established consumer information, separate general information from project-specific advice, and show publication dates and sources. We do not accept installer accreditation claims at face value.

Read our full editorial policy.

Get a quote

Get EV charger installation quotes

Start with the installation postcode and service. Add optional detail only if you have it.

Free, no obligationSubmit the form at no cost. You decide whether to accept any quote.

Local introductionsWe pass your enquiry to installers covering the postcode. Reply speed and volume both vary.

No lead sellingDetails go only to relevant installers for quote contact. See the privacy notice.

Ask each company for OZEV status where relevant, competent-person membership and insurance. We introduce local installers.

Add more project detail (optional)

You choose whether to accept any quote. Read our installer checks and privacy notice.

Get free quotes